Zhanjiang optimizes the business environment and creates a high-quality manufacturing development demonstration zone to introduce good projects with "creating the environment" and help the development of enterprises with practical actions

2023-01-11

The BASF (Guangdong) Integrated Base Project, a major Sino-German cooperation project with an investment of 10 billion euros, was fully constructed and the first set of equipment was put into operation; Zhanjiang Wuchuan Airport is positioned as a 4E domestic trunk airport and a Class I air port opened to the outside world by the state, and officially opened on March 24, 2022; The "Yongxing" shield machine of Zhanjiang Bay subsea tunnel of Guangzhou-Zhanjiang High-speed Railway successfully crossed the 2500-meter sea area and successfully crossed the sea into the city... In 2022, Zhanjiang set off a wave of project construction upsurge. Behind the rapid development, the whole city has made unremitting efforts to implement the optimization of the business environment into every link of high-quality economic and social development, and continue to create a market-oriented, legal and international business environment. On January 3, the reporter learned from the Zhanjiang Development and Reform Bureau that from January to November 2022, the total investment of key projects in Zhanjiang was 74.875 billion yuan, equivalent to 70% of the city's fixed asset investment volume, which is the "fixed star" to maintain stable economic growth. There are 76 new key projects, with a record number of new projects in the same period, providing strong support for stabilizing the overall economic and social development. The first set of equipment in BASF (Guangdong) integrated base has been successfully put into operation. Behind the settlement of leading enterprises, the extension of industrial chain and the multiplication of attraction for investment are the internal skills and foresight of a city to improve its business environment. In the process of serving the BASF (Guangdong) Integrated Base Project, Zhanjiang City coordinated with the Provincial Department of Ecological Environment, BASF Company and technical units to form a "four-party special team", held 11 special service coordination meetings, and promoted the preparation of the EIA report. The EIA document of the BASF (Guangdong) Integrated Base Project was approved by the Provincial Department of Ecological Environment on June 17, 2022, and the construction was started on September 6, which effectively shortened the project landing time. The sea use of the first phase of the project only took 5 months from the preliminary work of site selection and ecological assessment to the approval of sea use, creating the record of the shortest time for the approval of sea use (reclamation) of key projects in Guangdong. The special class invited domestic authoritative experts in petrochemical, chemical, hydrological, marine and environmental protection to form an expert team to help BASF project minimize pollutant emissions, reduce atmospheric pollutants by more than 20%, and reduce wastewater emissions by more than 89% compared with the original plan. "The most obvious thing is that government officials have become 'shop assistants', and the government has become the' intimate housekeeper 'of the project." The relevant head of Zhanjiang Development and Reform Bureau said that Zhanjiang has set up special classes for major project services in key areas such as energy engineering, major manufacturing projects, transportation infrastructure, and commercial circulation, and has a "chief service officer" for each major project in various fields, Special personnel shall follow up the difficulties encountered in major projects. At the same time, Zhanjiang has promoted the construction of key projects at a high level, implemented the responsibility system of contacting the leaders at the department level to serve major projects, set up a special team for promoting the implementation and production of major projects in Zhanjiang City, promoted the signing, commencement, completion and production of major projects as scheduled with the normalized mechanism services, actively coordinated the relevant national and provincial departments, and timely solved the problems encountered in the project land use indicators, energy consumption indicators and other approval work. In addition, Zhanjiang has improved the major project approval service zone and formed a full-process assistant service team to jointly provide the preliminary approval procedures for major projects

Edit:Hou Wenzhe    Responsible editor:WeiZe

Source:yangcheng evening news

Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com

Return to list

Recommended Reading Change it

Links

Submission mailbox:lwxsd@liaowanghn.com Tel:020-817896455

粤ICP备19140089号 Copyright © 2019 by www.lwxsd.com.all rights reserved

>