Important breakthrough in the construction of Shenzhen new consumer e-commerce headquarters base

2022-10-19

According to the news of China Construction Eighth Engineering Bureau on the 18th, recently, with the completion of the last pouring of concrete pump truck, the foundation slab of the tower area of Shenzhen New Consumer E-Commerce Headquarters Project was successfully poured, making an important breakthrough in the project construction. So far, the foundation slab of the project has been fully closed and entered the construction stage of the main structure. The project is located in the "Houhai Headquarters Base", Yuehai Street, Nanshan District, Shenzhen. The total construction area of the project is 59000 square meters, covering a total area of more than 2900 square meters. It is composed of a four storey basement, a two storey podium building and a 32 storey tower. The tower is 150 meters high. It is a comprehensive building integrating aboveground commerce, office work and underground parking. After the completion of the project, it will add another member to the Shenzhen Nanshan Houhai Headquarters Base, helping to give play to the scale advantage of the financial headquarters gathering in the Guangdong Hong Kong Macao Greater Bay Area. Project construction site. A few days ago, with the first hoisting of the steel structure of the project in place smoothly and accurately, the construction of the main steel structure of the project officially began. The tower of the project adopts striking mega steel structure "herringbone" diagonal bracing transformation, and the external hinged triangular curtain wall diagonal bracing, which has a very futuristic shape. The "herringbone" diagonal bracing structure is distributed in the west and south of the project tower, forming a large eccentric and discontinuous steel frame structure. The maximum diagonal bracing of a single piece is about 43 meters. The giant steel structure is a square hollow column, which is made of super thick steel plates. The maximum section size is about 1.96 square meters. The foundation slab of the tower area of the project has been successfully poured. The podium of the project is a steel frame structure, with unique shape, like a pyramid, which is consistent with the shape of the hollow part of the tower "herringbone brace". Visually, it seems to cut a piece from the southwest corner of the main tower, full of artistic sense, imagination and visual impact. The podium has three floors in total. The first floor is connected with the urban road, and the northeast of the second floor is designed with a three-dimensional green landscape, which is connected with the tower through the roof platform, and connected with the surrounding area of the plot through large steps. It also echoes the cultural landscape of the surrounding Shenzhen Bay Avenue. After completion, it will become a semi open public space, enriching the use experience of the building. (End) (Cheng Jingwei, Yang Junsheng, Dong Xue) (Lixin News Agency)

Edit:Luo yu    Responsible editor:Jia jia

Source:Chinanews.com

Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com

Return to list

Recommended Reading Change it

Links

Submission mailbox:lwxsd@liaowanghn.com Tel:020-817896455

粤ICP备19140089号 Copyright © 2019 by www.lwxsd.com.all rights reserved

>