The Song of Laborers | The Youth "Heat Energy" Deep in the Tianshan Mountains

2024-05-02

In the depths of the Tianshan Mountains, two reservoirs, one high and one low, lie quietly on both sides of the mountain, surrounded by numerous electric towers and flying silver wires. In the underground factory building between two reservoirs, the generator keeps making sounds of operation. This is the State Grid Xinyuan Fukang Pumped Storage Power Station in Xinjiang. Its No.1 generator unit was successfully put into operation on November 25th last year, making it the first pumped storage unit to be put into operation in the northwest region of China. The underground power plant has a grand scale, with four pumped storage power generation units installed, a total weight of over 4000 tons, and pressure steel pipes welded with special steel exceeding 140 million tons. The 20 young people from the Equipment Management Department (Mechanical and Electrical Department) of State Grid Xinyuan Xinjiang Fukang Pumped Storage Co., Ltd., with an average age of less than 28, have been inspecting and maintaining this large and complex power station equipment. Since the construction of the power station in 2017, most of them have been sticking to this place. Zhang Heping comes from Heze, Shandong. After graduating from university, he started working in the company and is now the Deputy Director of the Equipment Management Department (Mechanical and Electrical Department). When I first arrived here, there were no basic living facilities such as water, electricity, roads, and networks, and the conditions were harsh. "This job can help oneself make achievements and realize personal value. More importantly, it is honorable to participate in the construction of the first pumped storage power station in the northwest region and contribute to the construction of a new power system in the country.". Zhang Heping and other young colleagues not only face the challenge of connecting theoretical knowledge with practical work, but also constantly solve new problems encountered in various aspects such as profession and management. "At that time, the office was brightly lit late at night, and everyone worked together to study one technical problem after another. They were so excited that they forgot about time." This was the most unforgettable scene in the memory of the mechanical class leader He Wenbo. 24-year-old Yu Yihe is one of the four female members of the Equipment Management Department (Mechanical and Electrical Department), and this year is her third year of work. In her view, women face greater challenges in working in difficult areas, but it is meaningful to experience important engineering milestones with their youthful and energetic comrades. "Working for a long time is indeed tiring, but as long as the power plant operates normally and contributes to energy security, we will be happy." With the efforts of team members, Units 1 and 2 have achieved normal power generation. On April 23rd, Unit 3 successfully completed the dual condition grid connection test of pumped power generation, which is one step closer to the goal of all four units being connected to the grid for power generation by August this year. By adopting processes such as mechanical automatic welding and pre bending with a pipe bending machine, the utilization rate of steel plates has been increased from 70% to over 90%; When the generating unit operates at full load, the maximum swing of each bearing is 0.056 millimeters, which is better than the national standard of 0.2 millimeters. In recent years, they have closely cooperated with scientific research, design, and construction units to carry out joint research and development, and the technological innovation achievements they have obtained have provided valuable experience for the construction of similar power plants. The reporter learned that in recent years, this young team has won honors such as "Advanced Collective of State Grid Xinyuan Group" and "Pioneer Worker of Xinjiang Uygur Autonomous Region". The biggest challenge for the team next is to ensure the smooth operation of Units 3 and 4. "We are still young and need to further improve our skills to better serve the construction of power plants," said Zhang Heping. (Lai Xin She)

Edit:Luo yu    Responsible editor:Jia jia

Source:81.cn

Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com

Return to list

Recommended Reading Change it

Links

Submission mailbox:lwxsd@liaowanghn.com Tel:020-817896455

粤ICP备19140089号 Copyright © 2019 by www.lwxsd.com.all rights reserved

>