Stick to the post and strive to create happiness during the Spring Festival

2023-01-28

During the Spring Festival holiday, many people stick to their posts, work hard at the construction site, work hard in the factory workshop, and guard safety at the grass-roots level of the community. They interpret their responsibilities with perseverance, watch the lights of the house with actions, and become the beautiful scenery of the New Year. Although it is a holiday to fight for the construction line, there are still many busy figures on the construction site, in the factory and in the workshop. On the night of the third day of the Chinese New Year, the surface temperature in Wuhan, Hubei Province, dropped below 0 degrees Celsius, while underground operations were hot. With the roar, the cutterhead slowly rotates, and the shield machine advances steadily... At the bottom of the Yangtze River, 40 meters from the water, in the control room of the "Jiangcheng Excellence" shield machine, the driver Li Qi stares at the parameter changes on the display screen for operation. In recent days, Li Qi and more than 30 constructors from China Railway 14th Bureau Group Co., Ltd. have stuck together in the tunnel and made full efforts to achieve the goal of Wuhan Metro Line 12. The shield driven by Li Qi weighs more than 2900 tons and has a diameter of about 13 meters, which is equivalent to the height of four floors. "The more festive it is, the more we can't relax," Li Qi said. At present, the shield machine is digging 4 to 6 meters every day, and the construction of the river-crossing tunnel has completed 20% of the project progress. During the Spring Festival holiday, many builders in Xiong'an New Area of Hebei Province stuck to their posts and promoted project construction with high standards and quality. At the construction site of Xiong'an International Hotel Project, nearly 1000 people were busy at the site. Li Tao from the project department of Xiong'an International Hotel said: "During the Spring Festival holiday, we will focus on completing the fine decoration of individual buildings and the construction of outdoor landscape. As a priority exhibition area, the fine decoration of the base and surface layer of the building 3 and the conference center of the international hotel need to be constructed continuously at key nodes." In the project department of Xiong'an Sports Center, more than 100 builders stick to their posts. Fang Guoliang, the project manager, said: "On New Year's Eve, the management staff of the Project Department and the workers ate the New Year's Eve dinner together. The management staff of the Engineering Department and the Mechanical and Electrical Department volunteered to stick to the front line. Everyone is very energetic and strive to achieve the construction goals with quality and quantity guaranteed." This Spring Festival is to safeguard the lights of the family and ensure the social operation. Many people are quietly contributing. On the second day of the New Year, a long whistle sounded, and Panasonic Wharf in Fuzhou, Fujian Province welcomed the "Patria" ship loaded with imported soybeans. After the ship berthed and finished mooring, Rongcheng customs officers Lin Wenyuan and Wang Zhijie immediately boarded the ship to carry out the health quarantine work. "Thanks to the customs staff who stick to their posts, this ship of soybeans will stabilize the company's production and product supply," said Chen Yunyong, the head of the ship's soybean import company. In order to ensure the orderly customs clearance of imported materials during the Spring Festival holiday, Rongcheng Customs moved the port laboratory to the unloading site to realize "border inspection while unloading", accelerate the approval efficiency and improve the overall customs clearance speed. During the Spring Festival holiday, Dongqian Lake Scenic Spot in Ningbo, Zhejiang Province, ushered in the peak of passenger flow. "Let's check the power lines." The heating load is rising steadily. Xu Jun, the district manager of the Dongqianhu Power Supply Station of the State Grid Ningbo Power Supply Company, and his colleagues are checking the power lines of residential accommodation one by one. "The service is not closed, and we are online 24 hours a day." Xu Jun said that the State Grid Ningbo Power Supply Company has arranged the on-duty personnel to continue to carry out electricity safety inspection for local scenic spots, homestay and farmhouse operators, and provide 24-hour emergency repair service.

Edit:Hou Wenzhe    Responsible editor:WeiZe

Source:people.cn

Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com

Return to list

Recommended Reading Change it

Links

Submission mailbox:lwxsd@liaowanghn.com Tel:020-817896455

粤ICP备19140089号 Copyright © 2019 by www.lwxsd.com.all rights reserved

>