Guangzhou Metro resumed normal operation
2022-04-26
In combination with the real-time adjustment of the "three areas" of epidemic prevention and control in Baiyun District, from 10:00 on April 26, Guangzhou Transportation Bureau decided to restore the following public transport: 1、 Subway: entrance / exit a of Tongde station of Guangzhou Metro Line 8 resumed normal operation. 2、 In terms of public transport: restore the normal operation of three bus stops such as Shijing Hongxing Village terminal and Fushan dajiekou station (two-way), and the relevant lines can resume normal parking; Resume the normal operation of bus No. 254. Guangzhou Transportation Bureau reminds the general public to pay close attention to the official epidemic situation dynamic information, reasonably arrange travel, wear masks, actively show health codes and cooperate with temperature measurement. For the investigation personnel involved in relevant key areas and places, please go to the nearest nucleic acid detection point for nucleic acid detection, do personal protection, and do not travel by public transport. According to the official microblog of Guangzhou Metro, as of 15:00 on April 25, the operation of Guangzhou Metro had been adjusted, and only entrance a of Tongde of line 8 was closed. At 10:00 on April 26, the normal operation service of entrance a of Tongde station of Guangzhou Metro Line 8 was restored, and the whole line of Guangzhou Metro was restored to normal operation. (Xinhua News Agency)
Edit:Huang Huiqun Responsible editor:Huang Tianxin
Source:southcn.com
Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com