The "double berth" LNG terminal of Sinopec Tianjin LNG terminal is put into operation
2021-12-30
On December 29, a LNG carrier docked at "berth 2" of Sinopec Tianjin LNG terminal (photo of UAV). On the same day, a transport ship loaded with 69000 tons of LNG successfully docked at the "No. 2 berth" of Sinopec Tianjin LNG terminal, marking the official operation of the "double berth" LNG terminal, the main project of Sinopec Tianjin LNG terminal. The annual LNG receiving and unloading capacity of the terminal has been increased from 6 million tons to 10.8 million tons, which further enhances the natural gas supply capacity and will effectively ensure the warm winter of the people in North China. Sinopec Tianjin LNG terminal is located in Nangang Industrial Park, Binhai New Area, Tianjin. It is an important part of natural gas peak shaving and supply guarantee in North China. (outlook new era)
Edit:Ming Wu Responsible editor:Haoxuan Qi
Source:jjckb.cn
Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com